Troy/Wegner Bridge Demolition
Washington State University
Pullman, Washington
This progressive design-build project removed an existing concrete pedestrian bridge crossing Northeast Stadium Way at Washington State University’s main campus. As the design manager, Exeltech provided civil and structural engineering and landscape architecture services. These services included planning and review of demolition plans; developing Maintenance of Traffic plans for pedestrian and vehicular movement during the demolition of the bridge; retaining walls, roadway approaches, site grading, paving, sidewalk; and landscaping/irrigation. Exeltech coordinated the removal and relocation of existing electrical services, replacement of sidewalk, and restoration of landscape.